Permit: T22CM01241
Permit Details
Apply Date:
02/18/2022
Applicant:
Sunrun Installation Services, Inc La Donna Martin
Description:
- SYSTEM SIZE: 13035W DC, 9570W AC - MODULES: (33) LG ELECTRONICS: LG395Q1C-A6 - INVERTERS: (33) ENPHASE ENERGY: IQ7PLUS-72-2-US - RACKING: SNAPNRACK SERIES UR40; ULTRA RAIL SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438; 4-HOLE BASE WITH TILT KIT; SEE UR40-D12 - MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN PANEL WITH 125 AMP MAIN BREAKER TO BE REPLACED WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN BREAKER
Architects:
- Same as above
Contractors:
- Sunrun Installation Services, Inc
Permit Reviews
Permit Number - T22CM01241
Permit Status: Final
Permit Description: - SYSTEM SIZE: 13035W DC, 9570W AC
- MODULES: (33) LG ELECTRONICS: LG395Q1C-A6
- INVERTERS: (33) ENPHASE ENERGY: IQ7PLUS-72-2-US
- RACKING: SNAPNRACK SERIES UR40; ULTRA RAIL
SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438; 4-HOLE
BASE WITH TILT KIT; SEE UR40-D12
- MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN
PANEL WITH 125 AMP MAIN BREAKER TO BE REPLACED
WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN
BREAKER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/18/2022 | OTHER | 04/11/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T22CM01241
Permit Description: - SYSTEM SIZE: 13035W DC, 9570W AC
- MODULES: (33) LG ELECTRONICS: LG395Q1C-A6
- INVERTERS: (33) ENPHASE ENERGY: IQ7PLUS-72-2-US
- RACKING: SNAPNRACK SERIES UR40; ULTRA RAIL
SPEEDSEAL FOOT, SEE DRAWING SNR-DC-00438; 4-HOLE
BASE WITH TILT KIT; SEE UR40-D12
- MAIN PANEL REPLACEMENT: EXISTING 125 AMP MAIN
PANEL WITH 125 AMP MAIN BREAKER TO BE REPLACED
WITH NEW 225 AMP MAIN PANEL WITH 200 AMP MAIN
BREAKER
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2022 | ELECTRIC - SERVICE UPGRADE | TGAUSP | Approved | Approved, please send INCR Clearance to TEP for the electrical cutover |
| 09/23/2022 | TEP CLEARANCE - PM | TGAUSP | Approved | CODE DGC |
| 09/23/2022 | ELECTRIC - FINAL | TGAUSP | Approved | Approved, please send DGC Clearance to TEP for the solar meter |
| 09/23/2022 | BUILDING - FINAL | TGAUSP | Approved | Approved |