Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
761 W PRESIDENT ST
Apply Date:
02/02/2022
Applicant:
Eriberto Gamino
Description:
SFR

Permit Reviews

Permit Number - T22CM00804
Permit Status: Complete
Permit Description: SFR
Start Date Submittal Complete Date Status  
02/02/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 03/21/2022 COMPLETED Review Details
03/24/2022 RESUBMITTAL 03/25/2022 COMPLETED Review Details
04/11/2023 RESIDENTIAL NEW DWELLING v.1 05/09/2023 APPROVED Review Details
03/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/28/2025 APPROVED Review Details

Conditions

Permit Number - T22CM00804
Permit Status: Complete
Permit Description: SFR
Date Description Comments
10/02/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00804
Permite Description: SFR
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Not Ready
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
05/15/2023 COT - LCPL - Plumbing Intermediate N/A Canceled Canceled per homeowner. 5/15/2023
05/15/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled Canceled per homeowner. 5/15/2023
12/07/2022 COT - LCBU - Framing N/A Partial Pass partial per intermediates.
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00804
Permit Description: SFR
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/20/2022 COT - RSPL - Yard Water Line Passed {Activity date: 05/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved 1” building to meter, okay to backfill progress areas} ; {Activity date: 05/19/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR}
05/20/2022 COT - RSPL - Sewer Passed {Activity date: 05/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved connected to existing main, okay to backfill progress areas} ; {Activity date: 05/19/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR}
05/20/2022 COT - RSPL - Rough Soil Passed {Activity date: 05/20/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/19/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR, not on test}
05/26/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 05/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
05/26/2022 COT - RSBU - Preslab Passed {Activity date: 05/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
05/26/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/26/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
12/07/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/07/2022 COT - RSBU - Roof Nailing Passed
05/23/2023 COT - LCPL - Plumbing Intermediate Passed Approved 5/23/2023
05/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved 5/23/2023
05/23/2023 COT - RSPL - Gas Pressure Test Passed
05/23/2023 COT - LCBU - Framing Passed
05/23/2023 COT - RSEL - Construction Power Passed Clearance for TEP ECO. 5/23/2023
05/23/2023 RSME - Mechanical Progress Passed
12/05/2023 BULD - Electrical Clearance Passed TEP INCR
11/06/2024 RSBU - Building Final Passed
11/06/2024 COT - RSEL - Electrical Final Passed
11/06/2024 COT - RSME - Mechanical Final Passed
11/06/2024 COT - RSEL - Outdoor Lighting Passed
11/06/2024 COT - RSEL - Electrical Underground Passed
11/06/2024 COT - RSPL - Plumbing Final Passed
11/06/2024 COT - BULD - SWG Clearance Passed N/a. Gas meter is in place. 11/6/2024

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PDSD_OWNER_BUILDER_AFFIDAVIT_081623_V2.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
1_REV_PLAN_SET_V1.PDF DOCUMENTS VIEW
RESP. LTR._V1.PDF DOCUMENTS VIEW
1_MJC__V1.PDF DOCUMENTS VIEW