Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
492 S CONVENT AV
Address NEW:
492 S CONVENT AV
Apply Date:
02/01/2022
Applicant:
Description:
R-Renovation and Addition

Permit Reviews

Permit Number - T22CM00751
Permit Status: Complete
Permit Description: R-Renovation and Addition
Start Date Submittal Complete Date Status  
02/01/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 03/03/2022 COMPLETED Review Details
03/10/2022 RESUBMITTAL 09/27/2022 COMPLETED Review Details
01/23/2023 RESIDENTIAL NEW DWELLING v.3 03/15/2023 APPROVED Review Details
12/19/2022 RESIDENTIAL NEW DWELLING v.1 01/05/2023 REQUIRES RESUBMIT Review Details
01/17/2023 RESIDENTIAL NEW DWELLING v.2 01/17/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM00751
Permit Status: Complete
Permit Description: R-Renovation and Addition
Date Description Comments
02/22/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
03/17/2023 Contractor's active Arizona Contractor's License number for specified scope of work required prior to issuance of permit. , or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00751
Permite Description: R-Renovation and Addition
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
09/12/2023 COT - RSBU - Preslab N/A Not Ready Slab area needs to have plumbing areas covered and compacted.
10/05/2023 COT - RSPL - Yard Water Line N/A Partial Pass Inspection is for roof drains from roof to North side of building in to back yard
12/18/2023 RSEL - Electrical Progress N/A Partial Pass Outlets and,overhead lighting in kitchen remodel area.
12/18/2023 RSME - Mechanical Progress N/A Partial Pass AC/Heating vents in kitchen remodel area.
12/18/2023 RSPL - Plumbing Progress N/A Partial Pass Waste piping for sink in remodeled kitchen area.
05/03/2024 RSBU - Building Final N/A Re-inspection required 5/3/24: no roof access, GFCI missing at bathroom, smoke alarms missing per plan and code, WR receptacles on exterior.
05/03/2024 COT - RSEL - Electrical Final N/A Re-inspection required 5/3/24: no roof access, GFCI missing at bathroom, smoke alarms missing per plan and code, WR receptacles on exterior.
05/03/2024 COT - RSME - Mechanical Final N/A Not Ready 5/3/24: no roof access

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00751
Permit Description: R-Renovation and Addition
Total Completed Inspections - 20
Date Description Inspector Results Comments
06/27/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/14/2023 COT - RSBU - Masonry Pregrout Passed
08/22/2023 COT - RSBU - Roof Nailing Passed
09/12/2023 COT - RSPL - Rough Soil Passed Ok to cover progress areas.
09/12/2023 COT - RSPL - Sewer Passed Addition lines are connected to main existing sewer line.
09/22/2023 COT - RSBU - Preslab Passed Bedroom addition.

9/22/23: bathroom and living room addition ok to pour
11/03/2023 BULD - Electrical Clearance Passed
11/03/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Plumbing, electric, and mechanical in walls,and above ceiling are complete.
11/03/2023 COT - RSBU - Interior Shear Bracing Passed Framing in bedroom and bathroom ibis complete. Ok to insulate and cover walls.
11/03/2023 COT - RSPL - Yard Water Line Passed
12/18/2023 COT - RSPL - Gas Pressure Test Passed Gas clearance submitted to PDS at,1010 hours.
12/19/2023 COT - BULD - SWG Clearance Passed
05/03/2024 COT - RSEL - Outdoor Lighting Passed
05/03/2024 COT - RSPL - Plumbing Final Passed
05/03/2024 RSEL - Electrical Progress Passed
05/03/2024 RSME - Mechanical Progress Passed
05/03/2024 RSPL - Plumbing Progress Passed
05/08/2024 RSBU - Building Final Passed
05/08/2024 COT - RSEL - Electrical Final Passed
05/08/2024 COT - RSME - Mechanical Final Passed