Permit: T22CM00747
Permit Details
Apply Date:
02/01/2022
Applicant:
Deron Beal
Description:
Porch Additions and Studio WOP
Permit Reviews
Permit Number - T22CM00747
Permit Status: Complete
Permit Description: Porch Additions and Studio WOP
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/01/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 03/18/2022 | COMPLETED |
05/25/2022 | RESUBMITTAL | 06/14/2022 | COMPLETED |
07/01/2022 | RESUBMITTAL | 07/12/2022 | COMPLETED |
12/12/2022 | RESIDENTIAL NEW DWELLING v.1 | 01/09/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM00747
Permite Description: Porch Additions and Studio WOP
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 07/12/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
10/26/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | |
10/27/2022 | COT - LCBU - Framing | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM00747
Permit Description: Porch Additions and Studio WOP
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/26/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 07/26/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap Trench includes solar and main conduits from house to studio. This trench also includes conduits from adjacent pool to mechanical. All trenches, including water from house to pool, ok to backfill. Note: existing rear porch on house is well built and approved.} |
|
09/09/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
09/09/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
10/06/2022 | COT - RSBU - Masonry Pregrout | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Third lift top out.} ; {Activity date: 09/29/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. CMU walls at second lift: 8’ 4". Ok to grout progress areas.} ; {Activity date: 09/23/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Ok to take next lift to top out level. Ok to grout progress areas.} | |
10/17/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 10/17/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to dry in roof system.} ; {Activity date: 09/23/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Roof system has not been constructed.} | |
01/24/2023 | BULD - Electrical Clearance | Passed | ||
03/08/2023 | COT - RSEL - Electrical Final | Passed | ||
03/08/2023 | COT - RSME - Mechanical Final | Passed | ||
03/08/2023 | RSBU - Building Final | Passed |