Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
901 N PERRY AV
Apply Date:
02/01/2022
Applicant:
Deron Beal
Description:
Porch Additions and Studio WOP

Permit Reviews

Permit Number - T22CM00747
Permit Status: Complete
Permit Description: Porch Additions and Studio WOP
Start Date Submittal Complete Date Status  
02/01/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 03/18/2022 COMPLETED Review Details
05/25/2022 RESUBMITTAL 06/14/2022 COMPLETED Review Details
07/01/2022 RESUBMITTAL 07/12/2022 COMPLETED Review Details
12/12/2022 RESIDENTIAL NEW DWELLING v.1 01/09/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00747
Permite Description: Porch Additions and Studio WOP
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/12/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 07/12/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00747
Permit Description: Porch Additions and Studio WOP
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/26/2022 COT - RSEL - Electrical Underground Passed {Activity date: 07/26/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap
Trench includes solar and main conduits from house to studio.
This trench also includes conduits from adjacent pool to mechanical.
All trenches, including water from house to pool, ok to backfill.

Note: existing rear porch on house is well built and approved.}
09/09/2022 COT - RSBU - Preslab Passed {Activity date: 09/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/09/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 09/09/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
10/06/2022 COT - RSBU - Masonry Pregrout Passed {Activity date: 10/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Third lift top out.} ; {Activity date: 09/29/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. CMU walls at second lift: 8’ 4". Ok to grout progress areas.} ; {Activity date: 09/23/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Ok to take next lift to top out level. Ok to grout progress areas.}
10/17/2022 COT - RSBU - Roof Nailing Passed {Activity date: 10/17/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to dry in roof system.} ; {Activity date: 09/23/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Roof system has not been constructed.}
01/24/2023 BULD - Electrical Clearance Passed
03/08/2023 COT - RSEL - Electrical Final Passed
03/08/2023 COT - RSME - Mechanical Final Passed
03/08/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPECIFICATION SHEET.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
22-11-14 COT PERMIT REVISION T22CM00747_V1.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
CONS-PLAN SET_V1.PDF DOCUMENTS VIEW
JOB CARD_V1.PDF DOCUMENTS VIEW
PERMIT_V1.PDF DOCUMENTS VIEW
SPECIFICATION SHEET_V1.PDF DOCUMENTS VIEW