Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Address:
4512 E 25TH ST
Address NEW:
4512 E 25TH ST
Apply Date:
01/28/2022
Applicant:
Inty Power LLC
Description:
Installation of a 6.32 kW photovoltaic system.
Contractors:
  • Inty Power LLC

Permit Reviews

Permit Number - T22CM00692
Permit Status: Final
Permit Description: Installation of a 6.32 kW photovoltaic system.
Start Date Submittal Complete Date Status  
01/28/2022 OTHER 03/21/2022 COMPLETED Review Details
03/23/2022 REVISION - - 1ST 04/13/2022 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T22CM00692
Permit Description: Installation of a 6.32 kW photovoltaic system.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/17/2022 TEP CLEARANCE - PM DQUINN Approved CODE DGC
06/17/2022 ELECTRIC - FINAL DQUINN Approved Ap

Clear dgc

Close permit
06/17/2022 BUILDING - FINAL DQUINN Approved Ap

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET REV1.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW