Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
1424 N RICHEY BL 1
Apply Date:
01/28/2022
Applicant:
Description:
DPLX SWC2152 T21-M0059

Outstanding Activity Conditions

Permit Number - T22CM00688
Permit Status: Issued
Permit Description: DPLX SWC2152 T21-M0059
Total Outstanding Activity Conditions - 5
Date Name
01/28/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
01/28/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
02/23/2022 FUP T22OT00120 MUST BE PAID BEFORE FINAL INSPECTIONS.
04/25/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
04/25/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Conditions

Permit Number - T22CM00688
Permit Status: Issued
Permit Description: DPLX SWC2152 T21-M0059
Date Description Comments
02/23/2022 SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
02/23/2022 SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
02/23/2022 FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM00688
Permit Description: DPLX SWC2152 T21-M0059
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/22/2022 COT - RSPL - Rough Soil Passed {Activity date: 06/22/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
06/28/2022 COT - RSBU - Preslab Passed {Activity date: 06/28/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
06/28/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/28/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
07/07/2022 COT - RSPL - Sewer Passed {Activity date: 07/07/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/05/2022; Status: Cancelled; Inspector: DQUINN; Comment: Entered by NGARCIA3 - ca
Per Eric}
07/15/2022 COT - RSPL - Yard Water Line Passed {Activity date: 07/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/05/2022; Status: Cancelled; Inspector: DQUINN; Comment: Entered by NGARCIA3 - ca}
08/05/2022 COT - RSBU - Roof Nailing Passed {Activity date: 08/05/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/28/2022; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - CA per call from contractor.} ; {Activity date: 07/25/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready prior to contractor}
08/05/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 08/05/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/25/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready prior to contractor}
08/31/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 08/31/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/26/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Denied:1-Breakers must be accessible to all occupants( not behind locked door of bedroom). 2-Ufer connection is not accessible.} ; {Activity date: 08/25/2022; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor

}
09/02/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 09/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/25/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready prior to contractor}
09/02/2022 COT - RSBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 09/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/05/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval several pin holes in joints and not sealed behind top plate and top of wall on first layer} ; {Activity date: 07/25/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - not ready prior to contractor}
10/10/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/10/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - CODE ECO/UNITS #1, #2}
10/10/2022 COT - RSEL - Construction Power Passed {Activity date: 10/10/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap

Clear eco for #1 #2}
01/09/2023 COT - LCBU - Framing Passed
01/09/2023 COT - RSEL - Electrical Final Passed
01/09/2023 COT - RSEL - Outdoor Lighting Passed front & rear porch light fixtures are working
01/09/2023 COT - LCPL - Plumbing Intermediate Passed
01/09/2023 COT - RSME - Mechanical Final Passed
01/09/2023 RSBU - Building Final Passed project is complete
01/09/2023 COT - RSEL - Electrical Underground Passed
01/09/2023 COT - RSPL - Plumbing Final Passed
01/09/2023 RSME - Mechanical Progress Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW