Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM00647
Permit Details
Apply Date:
01/27/2022
Applicant:
Andrea Flood
Description:
SFR F50A19 T19-M0034
Permit Reviews
Permit Number - T22CM00647
Permit Status: Issued
Permit Description: SFR F50A19 T19-M0034
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2023 | REQUIRES RESUBMIT |
08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/14/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM00647
Permit Status: Issued
Permit Description: SFR F50A19 T19-M0034
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/27/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD |
Conditions
Permit Number - T22CM00647
Permit Status: Issued
Permit Description: SFR F50A19 T19-M0034
Date | Description | Comments |
---|---|---|
01/27/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
08/14/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/14/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/14/2023 | Post-Tension Inspection Report is required. | |
08/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM00647
Permite Description: SFR F50A19 T19-M0034
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/13/2023 | RSBU - Building Final | N/A | Re-inspection required | Disposal and dishwasher reciprocal not GFCI protected |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM00647
Permit Description: SFR F50A19 T19-M0034
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/16/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 03/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
03/16/2022 | COT - RSPL - Sewer | Passed | {Activity date: 03/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
03/16/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 03/16/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
03/25/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 03/25/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
04/19/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/30/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready } ; {Activity date: 03/25/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready} |
|
04/19/2022 | COT - RSBU - Preslab | Passed | {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/30/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready } ; {Activity date: 03/29/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO Provide soils report on compacted material. } ; {Activity date: 03/25/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval no AB or compact able fill and compact fill prior to placing post tension cables} |
|
04/19/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 04/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/30/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready } ; {Activity date: 03/25/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready} |
|
05/31/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 05/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
05/31/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 05/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
11/07/2022 | COT - RSEL - Construction Power | Passed | clearance required. TEP ECO | |
11/18/2022 | COT - LCBU - Framing | Passed | ||
11/18/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/12/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
02/28/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
03/13/2023 | COT - RSPL - Plumbing Final | Passed | ||
03/13/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
03/13/2023 | COT - RSME - Mechanical Final | Passed | ||
03/14/2023 | RSBU - Building Final | Passed | ||
03/14/2023 | COT - RSEL - Electrical Final | Passed |