Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
3188 W TUMAMOC DR
Apply Date:
01/26/2022
Applicant:
Description:
SFR

Permit Reviews

Permit Number - T22CM00597
Permit Status: Issued
Permit Description: SFR
Start Date Submittal Complete Date Status  
01/26/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 03/09/2022 COMPLETED Review Details
04/26/2022 RESUBMITTAL 06/02/2022 COMPLETED Review Details
06/09/2022 RESUBMITTAL 07/22/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM00597
Permit Status: Issued
Permit Description: SFR
Date Description Comments
02/16/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
02/16/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/22/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
07/22/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM00597
Permite Description: SFR
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/03/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 05/03/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
05/03/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 05/03/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM00597
Permit Description: SFR
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/04/2022 COT - RSPL - Rough Soil Passed {Activity date: 08/04/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to cover}
08/23/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
08/23/2022 COT - RSBU - Preslab Passed {Activity date: 08/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
08/23/2022 COT - RSEL - Electrical Underground Passed {Activity date: 08/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
08/23/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 08/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, special inspection reqd. for PT foundation}
09/23/2022 COT - RSBU - Roof Nailing Passed {Activity date: 09/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to dry in roof system. Please cancel this inspection for 26 September.}
09/23/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 09/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover exterior walls}
12/06/2022 COT - RSEL - Construction Power Passed
12/15/2022 COT - RSPL - Sewer Passed Approved with necessary 500gallon tank and sanitary pump to HCS, okay to backfill progress areas
12/19/2022 COT - LCBU - Framing Passed
12/20/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed corrections were made
01/09/2023 COT - HCBU - Interior Shear Bracing Passed corrections were made
03/29/2023 COT - RSPL - Gas Pressure Test Passed This inspection was for a gas pressure test FINAL. Please clear gas with SWG.
04/05/2023 COT - RSEL - Outdoor Lighting Passed
04/05/2023 COT - RSPL - Plumbing Final Passed All plumbing fixtures are installed and operational.
04/05/2023 COT - FCON - Sprinkler - Final Passed
04/05/2023 COT - RSME - Mechanical Final Passed A/c equipment is installed and operational. Registers are installed in every room.
04/05/2023 FCON – OH Piping & Hydro Passed
04/05/2023 RSBU - Building Final Passed Building is complete. Okay to issue a Level 4 Certificate of Occupancy.
04/05/2023 COT - FCON - Fire - Final Passed
04/05/2023 COT - RSEL - Electrical Final Passed All required GFCI outlets are operating properly. Bedrooms are equipped with an AFCI breaker at the panel. Electrical panel is properly labeled.