Permit: T22CM00597
Permit Details
Apply Date:
01/26/2022
Applicant:
Description:
SFR
Permit Reviews
Permit Number - T22CM00597
Permit Status: Issued
Permit Description: SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/26/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 03/09/2022 | COMPLETED |
04/26/2022 | RESUBMITTAL | 06/02/2022 | COMPLETED |
06/09/2022 | RESUBMITTAL | 07/22/2022 | COMPLETED |
Conditions
Permit Number - T22CM00597
Permit Status: Issued
Permit Description: SFR
Date | Description | Comments |
---|---|---|
02/16/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
02/16/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/22/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
07/22/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM00597
Permite Description: SFR
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/03/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 05/03/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
05/03/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 05/03/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
10/26/2022 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
10/27/2022 | COT - LCBU - Framing | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM00597
Permit Description: SFR
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/04/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to cover} | |
08/23/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
08/23/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
08/23/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
08/23/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, special inspection reqd. for PT foundation} | |
09/23/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to dry in roof system. Please cancel this inspection for 26 September.} | |
09/23/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover exterior walls} | |
12/06/2022 | COT - RSEL - Construction Power | Passed | ||
12/15/2022 | COT - RSPL - Sewer | Passed | Approved with necessary 500gallon tank and sanitary pump to HCS, okay to backfill progress areas | |
12/19/2022 | COT - LCBU - Framing | Passed | ||
12/20/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | corrections were made | |
01/09/2023 | COT - HCBU - Interior Shear Bracing | Passed | corrections were made | |
03/29/2023 | COT - RSPL - Gas Pressure Test | Passed | This inspection was for a gas pressure test FINAL. Please clear gas with SWG. | |
04/05/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
04/05/2023 | COT - RSPL - Plumbing Final | Passed | All plumbing fixtures are installed and operational. | |
04/05/2023 | COT - FCON - Sprinkler - Final | Passed | ||
04/05/2023 | COT - RSME - Mechanical Final | Passed | A/c equipment is installed and operational. Registers are installed in every room. | |
04/05/2023 | FCON – OH Piping & Hydro | Passed | ||
04/05/2023 | RSBU - Building Final | Passed | Building is complete. Okay to issue a Level 4 Certificate of Occupancy. | |
04/05/2023 | COT - FCON - Fire - Final | Passed | ||
04/05/2023 | COT - RSEL - Electrical Final | Passed | All required GFCI outlets are operating properly. Bedrooms are equipped with an AFCI breaker at the panel. Electrical panel is properly labeled. |