Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
01/25/2022
Applicant:
Description:
SFR MPLAN1510 T20-M0040

Permit Reviews

Permit Number - T22CM00575
Permit Status: Complete
Permit Description: SFR MPLAN1510 T20-M0040
Start Date Submittal Complete Date Status  
01/25/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 02/16/2022 COMPLETED Review Details
06/29/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/07/2023 APPROVED Review Details
07/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/24/2023 APPROVED Review Details

Conditions

Permit Number - T22CM00575
Permit Status: Complete
Permit Description: SFR MPLAN1510 T20-M0040
Date Description Comments
01/25/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
01/25/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
01/25/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/25/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
01/25/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/16/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
01/25/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00575
Permite Description: SFR MPLAN1510 T20-M0040
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00575
Permit Description: SFR MPLAN1510 T20-M0040
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/14/2022 COT - RSPL - Yard Water Line Passed {Activity date: 04/14/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to backfill}
04/14/2022 COT - RSPL - Sewer Passed {Activity date: 04/14/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to backfill}
04/14/2022 COT - RSPL - Rough Soil Passed {Activity date: 04/14/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
05/09/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 05/09/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved}
05/16/2022 COT - RSBU - Preslab Passed {Activity date: 05/16/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap} ; {Activity date: 05/09/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Under house only, no garage.
}
05/16/2022 COT - RSEL - Electrical Underground Passed {Activity date: 05/16/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap

Note: approved ufer is in garage footing, and approved under slab conduit is to house island}
05/16/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/16/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap} ; {Activity date: 05/09/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Under house only, no garage.
}
08/17/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 08/17/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover exterior walls.}
09/13/2022 COT - LCBU - Framing Passed {Activity date: 09/13/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to insulate and cover walls
}
09/13/2022 RSME - Mechanical Progress Passed {Activity date: 09/13/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
09/14/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 09/14/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to insulate and cover walls.} ; {Activity date: 09/13/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Electric only.}
09/14/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/14/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - CODE TMPP}
09/14/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 09/14/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/13/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Waste lines are not under hydro test.}
09/14/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 09/14/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved

CLEARANCE: Code: TMPP. Ok to set for construction power.

} ; {Activity date: 09/13/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Gas line is not under pressure test.}
10/19/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 10/19/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
11/29/2022 COT - RSEL - Construction Power Passed
05/31/2023 COT - RSEL - Outdoor Lighting Passed
05/31/2023 COT - RSBU - Roof Nailing Passed
05/31/2023 COT - RSEL - Electrical Final Passed
05/31/2023 COT - RSME - Mechanical Final Passed
08/04/2023 COT - RSPL - Plumbing Final Passed
08/08/2023 RSBU - Building Final Passed Approved. 8/8/2023