Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
01/25/2022
Applicant:
Alexander Anderson
Description:
SFR MPLAN1510 T20-M0040

Permit Reviews

Permit Number - T22CM00575
Permit Status: Complete
Permit Description: SFR MPLAN1510 T20-M0040
Start Date Submittal Complete Date Status  
01/25/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 02/16/2022 COMPLETED Review Details
06/29/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/07/2023 APPROVED Review Details
07/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/24/2023 APPROVED Review Details

Conditions

Permit Number - T22CM00575
Permit Status: Complete
Permit Description: SFR MPLAN1510 T20-M0040
Date Description Comments
01/25/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
01/25/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
01/25/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/25/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
01/25/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/16/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
01/25/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00575
Permite Description: SFR MPLAN1510 T20-M0040
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00575
Permit Description: SFR MPLAN1510 T20-M0040
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/14/2022 COT - RSPL - Yard Water Line Passed {Activity date: 04/14/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to backfill}
04/14/2022 COT - RSPL - Sewer Passed {Activity date: 04/14/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to backfill}
04/14/2022 COT - RSPL - Rough Soil Passed {Activity date: 04/14/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
05/09/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 05/09/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved}
05/16/2022 COT - RSBU - Preslab Passed {Activity date: 05/16/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap} ; {Activity date: 05/09/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Under house only, no garage.
}
05/16/2022 COT - RSEL - Electrical Underground Passed {Activity date: 05/16/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap

Note: approved ufer is in garage footing, and approved under slab conduit is to house island}
05/16/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 05/16/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap} ; {Activity date: 05/09/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Under house only, no garage.
}
08/17/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 08/17/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover exterior walls.}
09/13/2022 COT - LCBU - Framing Passed {Activity date: 09/13/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved. Ok to insulate and cover walls
}
09/13/2022 RSME - Mechanical Progress Passed {Activity date: 09/13/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
09/14/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 09/14/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to insulate and cover walls.} ; {Activity date: 09/13/2022; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Electric only.}
09/14/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/14/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - CODE TMPP}
09/14/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 09/14/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/13/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Waste lines are not under hydro test.}
09/14/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 09/14/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved

CLEARANCE: Code: TMPP. Ok to set for construction power.

} ; {Activity date: 09/13/2022; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Not ready. Gas line is not under pressure test.}
10/19/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 10/19/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
11/29/2022 COT - RSEL - Construction Power Passed
05/31/2023 COT - RSEL - Outdoor Lighting Passed
05/31/2023 COT - RSBU - Roof Nailing Passed
05/31/2023 COT - RSEL - Electrical Final Passed
05/31/2023 COT - RSME - Mechanical Final Passed
08/04/2023 COT - RSPL - Plumbing Final Passed
08/08/2023 RSBU - Building Final Passed Approved. 8/8/2023

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
T22CM00575_1372_SIC-2023-07-18_V1.PDF DOCUMENTS VIEW
131901-2 PT REPORT LOT 9 GARAGE COMPLETE-2023-06-28_V1.PDF DOCUMENTS VIEW
CONS-131901-1 PT REPORT LOT 9 MAIN HOUSE COMPLETE_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SITE PLAN.PDF CONSTRPLANS VIEW