Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
01/21/2022
Applicant:
Andrea Flood
Description:
SFR F50E19 T19-M0030

Permit Reviews

Permit Number - T22CM00486
Permit Status: Issued
Permit Description: SFR F50E19 T19-M0030
Start Date Submittal Complete Date Status  
01/21/2022 OTHER 02/01/2022 COMPLETED Review Details
06/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/05/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM00486
Permit Status: Issued
Permit Description: SFR F50E19 T19-M0030
Total Outstanding Activity Conditions - 2
Date Name
01/21/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
01/21/2022 NO FINAL UNTIL THE PUBLICSEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM00486
Permite Description: SFR F50E19 T19-M0030
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM00486
Permit Description: SFR F50E19 T19-M0030
Total Completed Inspections - 23
Date Description Inspector Results Comments
03/11/2022 COT - RSPL - Sewer Passed {Activity date: 03/11/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
03/11/2022 COT - RSPL - Rough Soil Passed {Activity date: 03/11/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
03/22/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 03/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
03/22/2022 COT - RSBU - Preslab Passed {Activity date: 03/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
03/22/2022 COT - RSEL - Electrical Underground Passed {Activity date: 03/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
03/22/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 03/22/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
05/19/2022 COT - RSBU - Roof Nailing Passed {Activity date: 05/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
06/13/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 06/13/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved

} ; {Activity date: 05/19/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO
1. Strap the two posts supporting the 4-ply girder that are separated by a header.
2. 2 full length king studs are required on end of GLB posting at tall wall patio door}
12/19/2022 COT - RSPL - Yard Water Line Passed
12/19/2022 RSME - Mechanical Progress Passed
02/16/2023 FCON – OH Piping & Hydro Passed
12/20/2022 COT - RSEL - Construction Power Passed
12/20/2022 COT - LCBU - Framing Passed
12/20/2022 COT - RSPL - Gas Pressure Test Passed
12/20/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/20/2022 BULD - Electrical Clearance Passed TEP ECO
02/16/2023 COT - FCON - Sprinkler - Final Passed
04/10/2023 COT - BULD - SWG Clearance Passed SWG clearance required
04/10/2023 COT - RSPL - Plumbing Final Passed
06/21/2023 COT - RSME - Mechanical Final Passed
06/21/2023 RSBU - Building Final Passed
06/21/2023 COT - RSEL - Outdoor Lighting Passed
06/21/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
CONS-152455 - SAGUARO TRAILS LOT 3339 - DRAINAGE REPORT_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW