Permit: T22CM00415
Permit Details
Apply Date:
01/19/2022
Applicant:
Andrea Flood
Description:
SFR F50E19 T19-M0030
Permit Reviews
Permit Number - T22CM00415
Permit Status: Issued
Permit Description: SFR F50E19 T19-M0030
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/19/2022 | OTHER | 01/21/2022 | COMPLETED |
04/03/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/07/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM00415
Permit Status: Issued
Permit Description: SFR F50E19 T19-M0030
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/19/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM00415
Permit Status: Issued
Permit Description: SFR F50E19 T19-M0030
Date | Description | Comments |
---|---|---|
01/19/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-052 IS ACCEPTED AND RELEASED BY PCRWRD | |
04/03/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/03/2023 | Post-Installed Anchor Inspection Report is required. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM00415
Permit Description: SFR F50E19 T19-M0030
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/04/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 03/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
03/04/2022 | COT - RSPL - Sewer | Passed | {Activity date: 03/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
03/04/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 03/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
03/14/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 03/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
03/14/2022 | COT - RSBU - Preslab | Passed | {Activity date: 03/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
03/14/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 03/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
03/14/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 03/14/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} | |
05/13/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 05/13/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
06/15/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 06/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 06/13/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready } ; {Activity date: 05/13/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO 1. Fire block all vertical chases longer then 10 feet at mid-point. 2. Large opening at patio calls for 2 king studs full height.} |
|
09/02/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO} | |
09/02/2022 | COT - RSEL - Construction Power | Passed | {Activity date: 09/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP TEP ECO} |
|
09/21/2022 | COT - LCBU - Framing | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/21/2022 | RSME - Mechanical Progress | Passed | {Activity date: 09/21/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
09/23/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/21/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE. 1. Gas lines failed air test 2. Install anchor bolts within 12” of end of plate at all shear walls. Hold downs required by the Engineer of Record can not do double duty as anchor bolts} |
|
09/23/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/21/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE} | |
12/14/2022 | COT - FCON - Fire - Final | Passed | ||
12/21/2022 | COT - BULD - SWG Clearance | Passed | SWG clearance required | |
12/21/2022 | COT - RSPL - Plumbing Final | Passed | ||
01/13/2023 | RSBU - Building Final | Passed | ||
01/13/2023 | COT - RSME - Mechanical Final | Passed | ||
01/13/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
01/13/2023 | COT - RSEL - Electrical Final | Passed |