Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Apply Date:
01/15/2022
Applicant:
Tesla Energy Operations INC.
Description:
Installation of PV Solar and Powerwall+ and related materials.
Contractors:
  • Tesla Energy Operations INC.

Completed Inspections

Permit Status: Final
Permit Number: T22CM00340
Permit Description: Installation of PV Solar and Powerwall+ and related materials.
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/20/2022 TEP CLEARANCE - PM DQUINN Approved CODE DGC/BATT
07/20/2022 ELECTRIC - FINAL DQUINN Approved Ap

Clear dgc and batt

Close permit
07/20/2022 BUILDING - FINAL DQUINN Approved Ap

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPEC SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW
REV1_PLANS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
REFERENCE DOCS.PDF DOCUMENTS VIEW
PANEL LIMITS AHJ INTRODUCTION LETTER.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW