Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Address:
6209 S 6TH AV
Address NEW:
6209 S 6TH AV
Apply Date:
01/12/2022
Applicant:
Fernando Hinojosa
Description:
SFR and Garage

Permit Reviews

Permit Number - T22CM00250
Permit Status: Expired
Permit Description: SFR and Garage
Start Date Submittal Complete Date Status  
02/08/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 03/15/2022 COMPLETED Review Details
03/15/2022 RESUBMITTAL 04/06/2022 COMPLETED Review Details
01/11/2023 RESIDENTIAL NEW DWELLING v.1 01/17/2023 APPROVED Review Details
05/01/2024 RESIDENTIAL NEW DWELLING v.1 05/30/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T22CM00250
Permit Status: Expired
Permit Description: SFR and Garage
Total Outstanding Activity Conditions - 1
Date Name
03/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - T22CM00250
Permit Status: Expired
Permit Description: SFR and Garage
Date Description Comments
03/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Expired
Permit Number: T22CM00250
Permite Description: SFR and Garage
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
11/15/2023 COT - RSPL - Backwater Valve N/A Not Applicable
12/06/2023 RSBU - Building Final N/A Re-inspection required 11/15/23: sediment trap at water heater needs to be properly installed, all pvc drains on exterior of house need to be coated for UV protection, Address missing on home. Level 1 TCO (ok to bring furniture only).
11/16/23: corrections made,
12/12/23: Level 4 TCO, owners could move into house. pending back porch
12/06/2023 COT - RSBU - Excavation/Rebar/Zoning N/A Partial Pass 12/6/23: footings for back porch CMU columns per plan ok to proceed.

Completed Inspections

Permit Status: Expired
Permit Number: T22CM00250
Permit Description: SFR and Garage
Total Completed Inspections - 24
Date Description Inspector Results Comments
08/12/2022 COT - RSPL - Rough Soil Passed {Activity date: 08/12/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay to cover}
08/24/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 08/24/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
08/24/2022 COT - RSBU - Preslab Passed {Activity date: 08/24/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved}
10/06/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/06/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE ECO}
10/06/2022 COT - RSEL - Construction Power Passed {Activity date: 10/06/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, please send ECO Clearance to TEP for the construction power

}
01/19/2023 COT - LCBU - Framing Passed
01/19/2023 FCON – OH Piping & Hydro Passed
01/19/2023 COT - LCPL - Plumbing Intermediate Passed
01/19/2023 COT - RSPL - Gas Pressure Test Passed
01/19/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/08/2023 COT - HCBU - Interior Shear Bracing Passed
07/24/2023 COT - FCON - Sprinkler - Final Passed
09/29/2023 COT - RSPL - Sewer Passed 9/29/23 Ok to back fill
11/15/2023 COT - RSPL - Plumbing Final Passed
11/15/2023 COT - RSEL - Electrical Final Passed
11/15/2023 COT - RSME - Mechanical Final Passed
11/15/2023 COT - FCON - Fire - Final Passed
11/15/2023 COT - RSEL - Outdoor Lighting Passed
11/15/2023 RSME - Mechanical Progress Passed
11/15/2023 COT - RSPL - Yard Water Line Passed
11/16/2023 COT - BULD - SWG Clearance Passed 11/15/23: SWG CLEARANCE
12/12/2023 COT - RSBU - Masonry Pregrout Passed 12/12/23: masonry pre grout passed.
01/02/2024 COT - RSBU - Roof Nailing Passed 1/2/24: roof nailing at back porch per plan ok to dry-in
01/02/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/2/24: roof nailing at back porch per plan ok to dry-in, clips at back porch per plan ok to proceed.

Documents

File Name Document Type  
CONS-VALDEZ 22-1125 REV 1_V1.PDF DOCUMENTS VIEW
VALDEZ REVISION LETTER - 22-1130_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW