Permit: T22CM00132
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
5301 S NOGALES HY BLDG 7
Address NEW:
5301 S NOGALES HY BLDG 7
Apply Date:
01/06/2022
Applicant:
Alex Pillion
Description:
New Multi-family Development Building 7
Permit Reviews
Permit Number - T22CM00132
Permit Status: Complete
Permit Description: New Multi-family Development Building 7
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/06/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 02/04/2022 | COMPLETED |
| 02/26/2022 | RESUBMITTAL | 03/17/2022 | COMPLETED |
| 04/15/2022 | RESUBMITTAL | 04/26/2022 | COMPLETED |
| 12/22/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/29/2023 | APPROVED |
| 01/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/25/2024 | APPROVED |
| 02/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/27/2024 | REQUIRES RESUBMIT |
| 01/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/29/2024 | APPROVED |
Conditions
Permit Number - T22CM00132
Permit Status: Complete
Permit Description: New Multi-family Development Building 7
| Date | Description | Comments |
|---|---|---|
| 12/14/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 04/19/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 04/19/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
| 04/19/2022 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 04/19/2022 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 04/19/2022 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
| 04/19/2022 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 04/19/2022 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 04/26/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 04/19/2022 | SHOP DRAWINGS REQUIRED FOR FIRE SPRINKLERS | |
| 04/19/2022 | SHOP DRAWINGS REQUIRED FOR FIRE ALARM | |
| 04/19/2022 | SHOP DRAWINGS REQUIRED FOR WOOD TRUSSES | |
| 02/02/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 04/26/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. | |
| 02/02/2024 | SPECIAL INSPECTION FOR DRYPACK IS REQUIRED | |
| 01/30/2024 | SPECIAL INSPECTION FOR Structural Steel IS REQUIRED | |
| 12/14/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM00132
Permite Description: New Multi-family Development Building 7
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | |
| 10/26/2022 | COT - LCBU - Preslab | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Roof Nailing | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Roof Drains | N/A | Not Ready | |
| 10/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | N/A | Not Ready | |
| 07/13/2023 | COT - LCBU - Building Progress | N/A | Partial Pass | |
| 12/15/2023 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install. |
| 12/21/2023 | COT - LCBU - Building Final | N/A | Partial Pass | Okay for TCO level 2 |
| 12/21/2023 | ENGR Engineering Final | N/A | Partial Pass | TC Of O Level 2 Will recall inspection the end of next week 12/29/23. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM00132
Permit Description: New Multi-family Development Building 7
Total Completed Inspections - 38
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2022 | COT - LCBU - Preslab | Passed | ||
| 01/27/2023 | COT - LCBU - Exterior Clips/Sheathing | Passed | 2nd and 3rd floor good on nailing schedule. | |
| 01/25/2023 | COT - LCBU - Roof Nailing | Passed | ||
| 03/02/2023 | COT - LCPL - Plumbing Roof Drains | Passed | building 7 approved | |
| 04/25/2023 | COT - LCPL - Plumbing Intermediate | Passed | Approved. Okay for drywall. 4/25/2023 | |
| 04/25/2023 | COT - LCEL - Electrical Above Ceiling | Passed | Approved. Okay for drywall. 4/25/2023 | |
| 04/25/2023 | COT - LCME - Mechanical Intermediate | Passed | Approved. Okay for drywall. 4/25/2023 | |
| 04/25/2023 | COT - LCEL - Electrical Intermediate | Passed | Approved. Okay for drywall. 4/25/2023 | |
| 07/11/2023 | COT - FCON - Underground Pressure | Passed | ||
| 09/22/2023 | BULD - Electrical Clearance | Passed | Electrical panel, meter boxes, and sub panels are complete for Units 7101, 7102, 7103, 7104, 7201, 7202, 7203, 7204, 7301, 7302, 7303, 7304, & house panel. Okay to energize main electrical panel and meter boxes. | |
| 09/22/2023 | COT - LCEL - Electrical Final | Passed | Cancelled per Don Vigil. Called in wrong inspection, needed inspection for electrical clearance. | |
| 12/13/2023 | COT - LCBU - Building Above Ceiling | Passed | ||
| 12/13/2023 | COT - LCEL - Electrical Progress | Passed | ||
| 12/13/2023 | COT - LCBU - Framing | Passed | ||
| 12/13/2023 | COT - LCPL - Plumbing Progress | Passed | ||
| 12/13/2023 | COT - LCME - Mechanical Above Ceiling | Passed | ||
| 12/13/2023 | COT - LCME - Mechanical Progress | Passed | ||
| 12/13/2023 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 12/13/2023 | COT - HCPL - Plumbing Progress | Passed | ||
| 12/13/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
| 12/13/2023 | COT - HCBU - Stem Wall/Retaining Wall | Passed | ||
| 12/13/2023 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 12/13/2023 | COT - LCBU - Sustainability | Passed | ||
| 12/13/2023 | COT - LCPL - Rough Soil | Passed | ||
| 12/13/2023 | COT - LCBU - Building Progress | Passed | ||
| 12/13/2023 | COT - LCPL - Sewer | Passed | ||
| 12/13/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 12/13/2023 | COT - LCPL - Backwater Valve | Passed | ||
| 12/14/2023 | COT - HCBU - Building Progress | Passed | ||
| 12/15/2023 | COT - LCME - Mechanical Final | Passed | ||
| 12/21/2023 | COT - FCON - Underground Flush | Passed | ||
| 12/21/2023 | COT - FCON - Alarm - Final | Passed | ||
| 12/21/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 12/21/2023 | COT - FCON - Fire - Final | Passed | ||
| 12/21/2023 | FCON – OH Piping & Hydro | Passed | ||
| 12/21/2023 | COT - LCPL - Plumbing Final | Passed | ||
| 01/31/2024 | COT - LCBU - Building Final | Passed | 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install. 12/21/23 recommend level 2 TCO 1/4/24: recommend Level 4 TCO 1/31/24: Passed ok for CofO |
|
| 01/31/2024 | ENGR Engineering Final | Passed |