Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/06/2022
Applicant:
Alex Pillion
Description:
New Multi-family Development Buildling 4

Permit Reviews

Permit Number - T22CM00129
Permit Status: Complete
Permit Description: New Multi-family Development Buildling 4
Start Date Submittal Complete Date Status  
01/06/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 02/04/2022 COMPLETED Review Details
02/26/2022 RESUBMITTAL 03/17/2022 COMPLETED Review Details
04/15/2022 RESUBMITTAL 04/26/2022 COMPLETED Review Details
01/31/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/02/2024 APPROVED Review Details
01/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/25/2024 APPROVED Review Details
01/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/29/2024 APPROVED Review Details

Conditions

Permit Number - T22CM00129
Permit Status: Complete
Permit Description: New Multi-family Development Buildling 4
Date Description Comments
04/18/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/18/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
04/18/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/18/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/26/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
04/18/2022 SHOP DRAWINGS REQUIRED FOR FIRE SPRINKLERS
04/18/2022 SHOP DRAWINGS REQUIRED FOR FIRE ALARM
04/18/2022 SHOP DRAWINGS REQUIRED FOR WOOD TRUSSES
04/26/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.
01/30/2024 SPECIAL INSPECTION FOR structural steel IS REQUIRED

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00129
Permite Description: New Multi-family Development Buildling 4
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Roof Drains N/A Not Ready
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCME - Mechanical Above Ceiling N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
12/14/2023 COT - LCEL - Service Upgrade N/A Not Applicable
10/26/2022 COT - FCON - Underground Flush N/A Not Ready
FCON – OH Piping & Hydro N/A Not Ready
09/22/2023 COT - LCEL - Electrical Final N/A Canceled Cancelled per Don Vigil. Called in wrong inspection, needed inspection for electrical clearance.
01/09/2024 COT - LCBU - Building Final N/A Partial Pass 1/9/24 Partial for TCO LEVEL 4

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00129
Permit Description: New Multi-family Development Buildling 4
Total Completed Inspections - 34
Date Description Inspector Results Comments
09/22/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 09/22/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
10/10/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 10/10/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/22/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Exterior walls only.}
10/10/2022 COT - LCBU - Preslab Passed {Activity date: 10/10/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved}
11/15/2022 COT - LCBU - Roof Nailing Passed
12/02/2022 COT - LCBU - Exterior Clips/Sheathing Passed
02/08/2023 COT - LCPL - Plumbing Roof Drains Passed
07/11/2023 COT - FCON - Underground Pressure Passed
11/16/2023 BULD - Electrical Clearance Passed Community building, office building 4. Clearance for TEP ECO. 11/16/2023
11/22/23 clearance resent
12/13/2023 COT - LCEL - Outdoor Lighting Passed
12/14/2023 COT - LCBU - Building Above Ceiling Passed
12/14/2023 COT - LCEL - Electrical Progress Passed
12/14/2023 COT - LCEL - Electrical Intermediate Passed
12/14/2023 COT - LCBU - Framing Passed
12/14/2023 COT - LCPL - Plumbing Progress Passed
12/14/2023 COT - LCME - Mechanical Above Ceiling Passed
12/14/2023 COT - LCME - Mechanical Progress Passed
12/14/2023 COT - HCPL - Plumbing Progress Passed
12/14/2023 COT - LCPL - Plumbing Above Ceiling Passed
12/14/2023 COT - LCBU - Sustainability Passed
12/14/2023 COT - LCEL - Electrical Above Ceiling Passed
12/14/2023 COT - LCME - Mechanical Intermediate Passed
12/14/2023 COT - LCBU - Building Progress Passed
12/14/2023 COT - LCPL - Sewer Passed
12/14/2023 COT - HCBU - Interior Shear Bracing Passed
12/14/2023 COT - LCPL - Backwater Valve Passed
12/21/2023 COT - FCON - Underground Flush Passed
12/21/2023 FCON – OH Piping & Hydro Passed
12/21/2023 COT - FCON - Alarm - Final Passed
12/21/2023 COT - FCON - Sprinkler - Final Passed
12/21/2023 COT - FCON - Fire - Final Passed
01/09/2024 COT - LCME - Mechanical Final Passed
01/09/2024 COT - LCEL - Electrical Final Passed
01/09/2024 COT - LCPL - Plumbing Final Passed
01/31/2024 COT - LCBU - Building Final Passed 12/15/23: UV Coat all vents going trough the roof, properly secure drainage of water heater pan in order to have proper air gap, Appliances need to be installed to ensure proper connections and install.
Ok for level 2 TCO
12/29/23: TCofO Level 4
1/31/24: ok for CofO

Documents

File Name Document Type  
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
NEWPORT AT THE RODEO FIRE ALARM_V1.PDF DOCUMENTS VIEW
NEWPORT AT THE RODEO FIRE SPRINKLERS BLDG 4_V1.PDF DOCUMENTS VIEW
NEWPORT AT THE RODEO TRUSS DRAWINGS_V1.PDF DOCUMENTS VIEW
NEWPORT BLDG. 4-2024-01-31_V1.PDF DOCUMENTS VIEW
10351 NEWPORT AT THE RODEO SPECIAL INSPECTION FINAL PACKET-2024-01-28_V1.PDF DOCUMENTS VIEW
10351 NAR WATER TESTING REPORT FOR BLDGS 1,2,3,4 (1)-2024-01-25_V1.PDF DOCUMENTS VIEW
NEWPORT AT THE RODEO - BUILDING 4 REPORT (REV)_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
SPECS.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
ZONING DECISION LETTER.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW