Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address:
7690 E 22ND ST
Apply Date:
01/04/2022
Applicant:
Description:
Dish Wireless to collocate onto an existing wireless communications tower by adding 3 antennas along

Permit Reviews

Permit Number - T22CM00065
Permit Status: Issued
Permit Description: Dish Wireless to collocate onto an existing wireless communications tower by adding 3 antennas along
Start Date Submittal Complete Date Status  
01/04/2022 CELL TOWER/ANTENNAS 02/02/2022 COMPLETED Review Details
02/22/2022 RESUBMITTAL 03/03/2022 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM00065
Permite Description: Dish Wireless to collocate onto an existing wireless communications tower by adding 3 antennas along
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - LCBU - Framing N/A Canceled Inspection Canceled
11/04/2022 COT - LCEL - Service Upgrade N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Issued
Permit Number: T22CM00065
Permit Description: Dish Wireless to collocate onto an existing wireless communications tower by adding 3 antennas along
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/12/2024 BULD - Electrical Clearance Passed Existing cell tower is in place, new electrical panel and meter box is installed, ground wire is connected to grounding rod. Okay to energize electrical panel and meter box. TEP ECO Clearance issued for project.
01/12/2024 COT - LCBU - Building Final Passed Existing cell tower is in place, new electrical panel and meter box is installed, ground wire is connected to grounding rod. Okay to energize electrical panel and meter box. TEP ECO Clearance issued for project.
01/12/2024 COT - LCEL - Electrical Final Passed Existing cell tower is in place, new electrical panel and meter box is installed, ground wire is connected to grounding rod. Okay to energize electrical panel and meter box. TEP ECO Clearance issued for project.

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
EFR LETTER.PDF DOCUMENTS VIEW
CELL TOWER FORM-SIGNED.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
ZONING APPROVAL.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW