Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22BU00275
Permit Details
Apply Date:
07/14/2022
Applicant:
Aaron Baker / Omni Pool Builders LLC.
Description:
New in ground pool 30amp electric run to pool EQ.
Architects:
- AMMTEC Consultants, PLLC
Contractors:
- Aaron Baker
Completed Inspections
Permit Status: Final
Permit Number: T22BU00275
Permit Description: New in ground pool
30amp electric run to pool EQ.
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/18/2022 | POOL/SPA BONDING GRID | TLUNDBERG | Approved | AP |
08/18/2022 | POOL/SPA HEATER | TLUNDBERG | Approved | NA |
08/18/2022 | POOL/SPA GAS | TLUNDBERG | Approved | NA |
08/18/2022 | POOL/SPA PRE-GUNITE | TLUNDBERG | Approved | AP |
10/05/2022 | POOL/SPA FIBERGLASS EXCV/PREP | TLUNDBERG | Approved | 8090.AP |
10/05/2022 | POOL/SPA FINAL/BARRIER | TLUNDBERG | Approved | AP SPECIAL NOTE: The mesh pool fence was remove since the first pool barrier final inspection. If it is reinstalled without bonding the metal legs, electrical shock maybe possible at ungrounded metal poles within 5 feet of waters edge |
10/05/2022 | POOL/SPA ELECTRIC | TLUNDBERG | Approved | AP |
10/05/2022 | POOL/SPA PLUMBING | TLUNDBERG | Approved | AP |