Permit: T22BU00216
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2200 N CAMINO PRINCIPAL
Address NEW:
2200 N CAMINO PRINCIPAL
Apply Date:
06/08/2022
Applicant:
AARON BAKER
Description:
NEW, POOL ONLY, SEMI-COMMERCIAL POOL, 16X30. Owner / other to install decking beyond pool coping.
Permit Reviews
Permit Number - T22BU00216
Permit Status: Complete
Permit Description: NEW, POOL ONLY, SEMI-COMMERCIAL POOL, 16X30. Owner / other to install decking beyond pool coping.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/08/2022 | POOL - SPA | 07/27/2022 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22BU00216
Permite Description: NEW, POOL ONLY, SEMI-COMMERCIAL POOL, 16X30. Owner / other to install decking beyond pool coping.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2022 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Not Applicable | N/A |
| 12/22/2022 | COT - LCME - Mechanical Final | N/A | Not Applicable | N/A |
| 12/22/2022 | COT - LCBU - Stem Wall/Retaining Wall | N/A | Not Applicable | N/A |
| 01/17/2023 | COT - ENGR - Site - Assurance Release | N/A | Not Ready | Complete all work is shown on the approved plans for this site prior to calling in this inspection for the final that’s all include all landscaping items and proper staking of all trees, all sidewalks and handicap access ramps, all drainage ways and retention basins, trash enclosures, And the installation of a Hydro seed in all areas that have been disturbed adjacent to this site. When scheduling this for a reinspection contracting personal needs to be on site with a set of the approved plans to be utilized during the inspection |
Completed Inspections
Permit Status: Complete
Permit Number: T22BU00216
Permit Description: NEW, POOL ONLY, SEMI-COMMERCIAL POOL, 16X30. Owner / other to install decking beyond pool coping.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2022 | COT - LCEL - Electrical Final | Passed | ||
| 12/22/2022 | COT - LCPL - Plumbing Final | Passed | ||
| 12/22/2022 | COT - LCBU - Building Progress | Passed | ||
| 12/22/2022 | COT - LCBU - Building Final | Passed | Note: Gates are lockable per TCO request for buildings. | |
| 05/24/2023 | COT - ENGR - Site - Assurance Release | Passed |