Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
12/13/2021
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP TO REPLCE 35' WOOD POLE WITH 40' STEEL POLE (RED CIRCLE), INSTALL A SUBSURFACE PEDESTAL (PURPLE SQUARE) IN BETWEEN POLE AND SIDEWALK, AND INSTALL DUCT IN BETWEEN POLE AND PEDESTAL TO PULL IN CABLE TO MAKE READY FOR A SERVICE INCREASE AT 3508 S 8TH AVE
PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF PRECONSTRUCTION MEETING
NOTE: S 8TH AVE IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.