Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
12/13/2021
Applicant:
DIVISION II CONSTRUCTION COMPANY
Description:
Storm Drains tie ins total 4 = 1) 8’ L X 8’ D X 2’ W 2) 25’L X 8’ D X 2’ W 3) 19’ L X 8’ D X 2’ W 4) 21’ L X 8’ D X2’ W
All work is in the fenced area of right of way that the PIA work is being done in
PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.