Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
12/08/2021
Applicant:
PAVEMENT RESTORATION INC
Description:
SERVICE AGREEMENT 222925
SURFACE APPLICATION OF ARA-ti TO COUNTRY CLUB RD BETWEEN AVIATION PARKWAY TO BROADWAY BL.
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION.
2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE.
3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
4. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION.
5. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH.
6. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.)
7. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE.
8. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES.
9. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE.
10. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION.
11. MAINTAIN PEDESTRIAN ACCESS
12. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS.
13. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813
02/24/2022 - PLAN CHANGE AND RENEWAL - R1
Crack Sealing estimated two day operation and Striping estimated three day operation. Scheduling striping will depend on when the crack sealing is completed.
03/17/2022 - PLAN CHANGE - R2
ADDING MCP FOR CORE SAMPLES.
Contractors:
- QUAIL CONSTRUCTION ARIZONA LLC
- VIASUN CORPORATION
Documents
| File Name |
Document Type |
|
| T21RW05205 R1.PDF |
ROW-RIGHT OF WAY |
VIEW
|
| T21RW05205 R2.PDF |
ROW-RIGHT OF WAY |
VIEW
|
| T21RW05205.PDF |
ROW-RIGHT OF WAY |
VIEW
|
| T21RW04083 R1.PDF |
ROW-RIGHT OF WAY |
VIEW
|
| T21RW04083 R2.PDF |
ROW-RIGHT OF WAY |
VIEW
|