Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
08/26/2021
Applicant:
SOUTHWEST GAS
Description:
5 x 5' bell hole in Asphalt pavement 3 feet south of curb flowline in R.O.W.
Remove and Replace Asphalt & Concrete Sidewalk for Pipe trench.
Proof of notification is required at the time of the preconstruction meeting.
Contractor shall restore all non-pavement surfaces disturbed by construction or damaged by the contractor, in accordance with City Standards and Specifications for Public Improvements.
Pedestrian access must be provided and maintained per MUTCD Chapter 6D. Field Adjustments may be required.
Contractors:
- FISHEL CONSTRUCTION COMPANY (FN)
- UNDERGROUND CONSTRUCTION CO INC