Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
08/24/2021
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP WILL NEED TO INSTALL 1 NEW POLE IN THE RIGHT OF WAY AND WILL ALSO NEED TO PARK ALONG SAN JUAN TRAIL. THE POLE EXCAVATION WILL BE 6.5' DEEP & HAVE A 24" DIAMETER. SEE ATTACHED MAP.
1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
2. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE.
3. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION.
4. MAINTAIN PEDESTRIAN ACCESS
Documents
| File Name |
Document Type |
|
| T21RW03945 R1 |
ROW-RIGHT OF WAY |
VIEW
|
| T21RW03945 |
ROW-RIGHT OF WAY |
VIEW
|