Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
06/18/2021
Applicant:
SOUTHWEST GAS
Description:
(1) 5X5 BELLHOLE IN THE DIRT TO REPLACE GAS SERVICE
Proof of notification is required at the time of the preconstruction meeting.
S Via Hondo is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes.
Contractors:
- FISHEL CONSTRUCTION COMPANY (FN)
- UNDERGROUND CONSTRUCTION CO INC
Documents
| File Name |
Document Type |
|
| T21RW02971.PDF |
ROW-RIGHT OF WAY |
VIEW
|