Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
06/07/2021
Applicant:
DOMINGUEZ EARTH MOVERS INC
Description:
PLACE POWER DUCT FROM AN UNDERGROUND VAULT IN THE CENTER OF THE NORTHBOUND LANE TO THE NEW NORTHWEST HOSPITAL BEING BUILT ON THE WEST SIDE OF HOUGHTON RD - EXCAVATION: 250'
PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION.
POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH.
BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.)
ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE.
REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE.
GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION
MAINTAIN PEDESTRIAN ACCESS
06/14/2021 - MCP PLAN ADD - R1
CONDITIONS ADDED: THE SHOULDER AREA WHERE TRAFFIC WILL BE ROUTED SHALL BE PAVED WITH A STABILIZED COMPACTED MATERIAL AND SHALL BE MAINTAINED FOR THE DURATION OF THE TEMPORARY TRAFFIC CONTROL SETUP.