Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
06/03/2021
Applicant:
INNOVATIONS CONSTRUCTION LLC
Description:
CURB CUT AND INSTALLATION OF NEW DRIVEWAY APRON AND SIDEWALK
PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION.
POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH.
BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.)
ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE.
CONCRETE DRIVEWAY APRON TO BE CONSTRUCTED PER P.A.G. STANDARD 206
CONCRETE CURB TO BE CONSTRUCTED PER P.A.G. STANDARD 209
CONCRETE SIDEWALK TO BE CONSTRUCTED PER P.A.G. STANDARD 200
REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE.
GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION
MAINTAIN PEDESTRIAN ACCESS
Documents
| File Name |
Document Type |
|
| T21RW02677.PDF |
ROW-RIGHT OF WAY |
VIEW
|