Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
78 W RIVER RD
Apply Date:
05/24/2021
Applicant:
COX COMMUNICATIONS
Description:
From Cox Ped S on 42 W Stone Loop, Head NW and begin 227' pull through existing 48ct fiber. Remove and replace ped. Tie in, head SW and continue 76' pull through existing 48ct fiber. Head W and continue 285' pull through existing 48ct fiber. Place 4x4' pot hole and new Cox vault. Tie in. Head S and begin 25' trench/bore placing 1-2" conduit and 48ct fiber in to out of ROW at 78 W River Rd. Stone Loop is under a pavement cut moratorium until September 25, 2023. Pavement cuts are not permitted without written authorization form the Dept. of Transportation & Mobility. W Stone Lp is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
Contractors:
  • OPTIMUM AZ INC

Documents

File Name Document Type  
T21RW02545.PDF ROW-RIGHT OF WAY VIEW