Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
05/21/2021
Applicant:
COX COMMUNICATIONS
Description:
STARTING ON THE NORTH SIDE OF E BILBY RD AND WEST OF TUCSON BL TRENCH/BORE 140' GOING EAST ON CALLE PELICANO TO PLACE 1-2" CONDUIT AND PULL NEW .625P3 TO REPLACE DAMAGE .625P3 AND SPLICE LIKE FOR LIKE. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. INGRESS/ EGRESS FOR RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS.
Contractors:
  • OPTIMUM AZ INC

Documents

File Name Document Type  
T21RW02525.PDF ROW-RIGHT OF WAY VIEW