Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
05/18/2021
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP TO INSTALL NEW POLE & REPLACE EXISTING Transformer. We will need to park In Right of Way on Liberty. The pole Hole Excavation will have a Hole Diameter of 20” & will be set 5.5’ deep.
NOTE: Proof of notification is required at the time of the preconstruction meeting.
Documents
| File Name |
Document Type |
|
| T21RW02436.PDF |
ROW-RIGHT OF WAY |
VIEW
|