Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Details
Status:
Withdrwn
Type:
Barricade and Excavation
Apply Date:
05/13/2021
Applicant:
EAGLE ROCK EXCAVATING L L C
Description:
DP 20-0201 provided plans T20PI00017
Removing sidewalk - digging down at existing hydrant, removing hydrant, excavate 15', install 15' of DIP. reconnect hydrant
MCP - RETURNED FOR CORRECTIONS:
Revise MCP to address pedestrian considerations. Indicate how pedestrian access will be maintained in accordance to ADA requirements though the work zone.
Indicate how access to the bus stop within the work zone will be maintained.