Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
05/11/2021
Applicant:
SOUTHWEST GAS
Description:
(2) 5x5 bellholes in dirt/blktop front---- repair/replace/pothole gas line Proof of notification is required at the time of the preconstruction meeting. Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.