Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
05/07/2021
Applicant:
COX COMMUNICATIONS
Description:
From the existing COX ped, SW corner of 441 E University Blvd , begin 112' trench/bore, replacing damage 2-2'' conduit and .625 coax cable, heading West. Continue 35' trench/bore heading North to out of ROW. Proof of notification is required at the time of the preconstruction meeting. SUNTRAN TRACK ACCESS PERMIT #060121-01 PARK TUCSON SHALL BE NOTIFIED BEFORE WORK STARTS TO NOTIFY NEIGHBORS WHO UTILIZE THE RESIDENTIAL PARKING PERMIT ZONE. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS.
Contractors:
  • TRUENET COMMUNICATIONS CORP

Documents

File Name Document Type  
T21RW02245 R1.PDF ROW-RIGHT OF WAY VIEW