Permit Details
Status:
Withdrwn
Type:
Barricade and Excavation
Apply Date:
05/06/2021
Applicant:
COX COMMUNICATIONS
Description:
From the TEP pole West of 370 N Pantano Rd, riser down, and begin 10' trench/bore, placing 6-2'' conduit's and placing 288' fiber. and place 3 x 3 pothole and new COX vault continue 5' trench/bore and place 3x3 pothole and a new COX ped. Continue 593' trench/bore heading South, placing 3x3 pothole and a new COX vault. Continue 608' trench bore placing 3x3 pothole and new COX vault. Continue 544' trench/bore heading South, place 3x3 pothole and new COX vault. Continue 315' trench/bore heading West, place 3x3 pothole and new COX vault tie, in. Continuing from the COX vault SE corner of Roadway Blvd and E Broadway Blvd, 226' trench/bore, placing 6-2'' conduit and 288ct fiber, place 3x3 pothole and new COX vault/ Riser up TEP pole and begin 674' aerial overlash heading West. adding 288ct fiber, tie into TEP pole. Part 2: Remove 370 N Pantano Rd, remove 2010' aerial overlash heading South to TEP pole .Part 3: West of S Pantano Rd from TEP pole remove 560' aerial overlash heading East to TEP pole.
Proof of notification is required at the time of the preconstruction meeting.