Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
04/16/2021
Applicant:
BORDERLAND CONSTRUCTION COMPANY
Description:
CHANGED SCOPE OF WORK: REMOVE EXISTING CONCRETE MEDIAN ON S M L KING JR WAY AND PLACE NEW ASPHALT 35' x 3' x 4" WATERLINE TIE IN 30'L X 2'W X 5'D Proof of notification is required at the time of the preconstruction meeting. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS

Documents

File Name Document Type  
T21RW01814 R6.PDF ROW-RIGHT OF WAY VIEW
T21RW01814 R4.PDF ROW-RIGHT OF WAY VIEW
T21RW01814 R2.PDF ROW-RIGHT OF WAY VIEW
T21RW01814.PDF ROW-RIGHT OF WAY VIEW
T21RW01814 R1.PDF ROW-RIGHT OF WAY VIEW