Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
03/23/2021
Applicant:
CROWN CASTLE
Description:
BORE AND TRENCH 92' TO PLACE 3-1.25" INNERDUCT. PLACE 2-30X48 HANDHOLES AND PLACE 4 DOWN GUYS AND ANCHORS. PALCE AERIAL CABLE AND STRAND FOR 2637'. ALL PLACEMENT IS DIRECTLY ASSOCIATED WITH A SMALL WIRELESS FACILITY. JOB PREVIOUSLY PERMITTED UNDER T20RW04826. ADDRESS ON APP CHANGED FROM 793 N ARIZONA AV NOTES/CONDITIONS: BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. R2 PLAN ADD - ADD TCP TO PLACE NO PARKING SIGNS IN WORK ZONE - R2 INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. ARCHEOLOGICAL SENSITIVITY ZONE: This project is located in a City of Tucson Archaeological Sensitivity Zone. An archaeological monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. The Arizona State Museum can furnish a list of qualified archaeologists. Please allow up to 30 days for the monitor to obtain a project-specific Arizona Antiquities Act permit before scheduling the work. The existing City of Tucson monitoring and discovery plan for excavation within an Archaeological Sensitivity Zone may be used by the monitor to obtain the permit. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
Contractors:
  • R DIRECTIONAL DRILLING AND UNDERGROUND TECHNOLOG
  • TRUENET COMMUNICATIONS CORP

Documents

File Name Document Type  
T21RW01361 R1.PDF ROW-RIGHT OF WAY VIEW
T21RW01361.PDF ROW-RIGHT OF WAY VIEW