Permit Details

Status:
Final
Type:
Barricade and Excavation
Address NEW:
1701 E SPEEDWAY BL
Apply Date:
03/02/2021
Applicant:
CENTURYLINK
Description:
N.831006- ALONG N. WARREN AVE ACCESS MH 7068 TO SPLICE AND PLACE NEW NEW CABLE IN EXISTING DUCT. PLACE 1 PED. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. MUST COORDINATE WITH SUN LINK PRIOR TO BEGINNING WORK. Pursuant to Tucson Code Section 16-31 (d), a request for temporary exemption from the maximum permissible sound levels permitted by Chapter 16, Article IV of the Tucson Code is required to be submitted when: (a) noise from construction activities is proposed in excess of allowed dB(A) and/or (b) construction activity is proposed outside permitted hours of sunrise through 8:00pm, Monday through Saturday or on legal holidays. AN APPROVED TEMPORARY NOISE EXEMPTION MUST BE PROVIDED BEFORE THE PRE-CONSTRUCTION MEETING. 05/03/2021 - PLAN CHANGE - NEW MCP ADDED - R1
Contractors:
  • FISHEL CONSTRUCTION COMPANY (FN)

Completed Inspections

Permit Status: Final
Permit Number: T21RW00974
Permit Description: N.831006- ALONG N. WARREN AVE ACCESS MH 7068 TO SPLICE AND PLACE NEW NEW CABLE IN EXISTING DUCT. PLACE 1 PED. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. MUST COORDINATE WITH SUN LINK PRIOR TO BEGINNING WORK. Pursuant to Tucson Code Section 16-31 (d), a request for temporary exemption from the maximum permissible sound levels permitted by Chapter 16, Article IV of the Tucson Code is required to be submitted when: (a) noise from construction activities is proposed in excess of allowed dB(A) and/or (b) construction activity is proposed outside permitted hours of sunrise through 8:00pm, Monday through Saturday or on legal holidays. AN APPROVED TEMPORARY NOISE EXEMPTION MUST BE PROVIDED BEFORE THE PRE-CONSTRUCTION MEETING. 05/03/2021 - PLAN CHANGE - NEW MCP ADDED - R1
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/03/2021 TDOT-EXCAV GENERAL INSPECTION Bravin Approved Manhole access only. No issues