Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
02/01/2021
Applicant:
COX COMMUNICATIONS
Description:
Starting on the East Side of S. Calle Santa Cruz, place a 3x3x3 pothole, from pothole METRO BORE North 550' placing 2X2" CONDUITS and .625 coax, place another 3x3x3 pothole Continue METRO BORE East 53' to out of row INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS.
Contractors:
  • OPTIMUM AZ INC

Documents

File Name Document Type  
T21RW00512.PDF ROW-RIGHT OF WAY VIEW
T21RW00512 R1.PDF ROW-RIGHT OF WAY VIEW