Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
01/13/2021
Applicant:
TUCSON ELECTRIC POWER **B
Description:
22nd ST TO EL CON - PHASE 4 - OVERHEAD LINE CONNECTION
TEP will be replacing multiple poles in the area of Broadway and Alvernon. All replacements will be of similar size and placement as the originals. A new pole is being placed behind sidewalk on the east side of Alvernon, north of Timrod. The new pole will be similar diameter but shorter than the existing poles. TEP will also be replacing multiple pad mount transformers in the same area. All transformers will stay in the existing positions.
04/16/2021 - REVISED APPROVED TNE (ATTACHED) FOR OVERNIGHT WORK BEGINNING APRIL 21, 2021 THROUGH MAY 21, 2021. - R3
Documents
File Name |
Document Type |
|
T21RW00179 R3.PDF |
ROW-RIGHT OF WAY |
VIEW
|
T21RW00179 R1.PDF |
ROW-RIGHT OF WAY |
VIEW
|
T21RW00179 R2.PDF |
ROW-RIGHT OF WAY |
VIEW
|
T21RW00179.PDF |
ROW-RIGHT OF WAY |
VIEW
|