Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Floodplain Use
Apply Date:
12/15/2021
Applicant:
Dorothy C. Dolan
Description:
Welll Site H-002B Rehabilitation, this was previously submitted. This is first time online form bein

Permit Reviews

Permit Number - T21OT00926
Permit Status: Issued
Permit Description: Welll Site H-002B Rehabilitation, this was previously submitted. This is first time online form bein
Start Date Submittal Complete Date Status  
12/30/2021 FLOODPLAIN 01/10/2022 COMPLETED Review Details

Conditions

Permit Number - T21OT00926
Permit Status: Issued
Permit Description: Welll Site H-002B Rehabilitation, this was previously submitted. This is first time online form bein
Date Description Comments
01/10/2022 Floodplain Use Permit T21OT00926January 10, 2022 (No Elevation Certificate Required). The applicant is authorized to use a portion of the Special Flood Hazard Area (FEMA Zone X, Panel 2925L, Lee Moore Wash Basin Management Study Area) in the City of Tucson at 12898 S HOUGHTON RD for improvements to an existing Tucson Water well site H-002. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations require the issuance of an additional Floodplain Use Permit.The following conditions shall apply to this permit:1. All work shall conform to the attached plans DP21-0253 which are made part of this permit (including the recommendations from the final drainage assessment by JE Fuller dated October 2021).2. The existing drainage patterns at the property lines shall not be obstructed or changed.3. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties.4. This permit becomes invalid and is subject to additional floodplain review, if any required development permit (s') changes the configuration of the structure and or site development.5. Any future development of the sight including patio walls to be constructed will require a separate Floodplain Use Permit.This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions set forth in this permit are not complied with.