Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
12/27/2021
Applicant:
Russ Salmon
Description:
SFR LENNVC355 T20-M0034

Outstanding Activity Conditions

Permit Number - T21CM09902
Permit Status: Issued
Permit Description: SFR LENNVC355 T20-M0034
Total Outstanding Activity Conditions - 1
Date Name
12/27/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T21CM09902
Permit Status: Issued
Permit Description: SFR LENNVC355 T20-M0034
Date Description Comments
12/27/2021 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Completed Inspections

Permit Status: Issued
Permit Number: T21CM09902
Permit Description: SFR LENNVC355 T20-M0034
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/10/2022 COT - RSPL - Sewer Passed {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
02/11/2022 COT - RSPL - Rough Soil Passed {Activity date: 02/11/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 02/10/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO leak in ABS}
02/18/2022 COT - RSPL - Yard Water Line Passed {Activity date: 02/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 02/11/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO. Replace hose bib} ; {Activity date: 02/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
02/28/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 02/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
02/28/2022 COT - RSBU - Preslab Passed {Activity date: 02/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
02/28/2022 COT - RSEL - Electrical Underground Passed {Activity date: 02/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
02/28/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 02/28/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
03/30/2022 COT - LCBU - Framing Passed {Activity date: 03/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
04/01/2022 COT - RSBU - Roof Nailing Passed {Activity date: 04/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
04/01/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 04/01/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 03/30/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO
framing at side exterior door not per plan.}
05/17/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 05/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CODE ECO}
05/17/2022 COT - RSEL - Construction Power Passed {Activity date: 05/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP
TEP ECO}
06/27/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 06/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/30/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 06/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/27/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO
1. Shim let-in at non-bearing walls
2. Vents are dry
3. Replace exhaust duct in laundry
4. Block top of walls under stairs}
07/22/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 07/22/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
09/07/2022 COT - BULD - SWG Clearance Passed {Activity date: 09/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - CODE}
09/23/2022 COT - RSME - Mechanical Final Passed {Activity date: 09/23/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved}
09/28/2022 RSBU - Building Final Passed {Activity date: 09/28/2022; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - Truss Plan released} ; {Activity date: 09/28/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS
} ; {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/23/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready per electrical and plumbing finals.}
09/28/2022 COT - RSEL - Outdoor Lighting Passed {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - 1090.Approved}
09/28/2022 COT - RSPL - Plumbing Final Passed {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/23/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - not ready. Draining pipes need to be cut. Minimum 6" from grade level.} ; {Activity date: 09/07/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - partial. Clearance for southwest gas.}
09/28/2022 COT - RSEL - Electrical Final Passed {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/23/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Receptacles have an open ground in second and third bedrooms upstairs.}

Documents

File Name Document Type  
FINAL SIC.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
VC 20 355 AR8.PDF DOCUMENTS VIEW
VC 20 355 PERMIT APPLICATION.PDF DOCUMENTS VIEW
VC 20 SPECIAL INSPECTION CERT 2-18-2020.PDF DOCUMENTS VIEW
VC PLAN 355 CITY APPROVEDPDF.PDF DOCUMENTS VIEW