Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
12/27/2021
Applicant:
Russ Salmon
Description:
SFR LENNVC354 T20-M0030

Outstanding Activity Conditions

Permit Number - T21CM09877
Permit Status: Issued
Permit Description: SFR LENNVC354 T20-M0030
Total Outstanding Activity Conditions - 1
Date Name
12/27/2021 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T21CM09877
Permit Status: Issued
Permit Description: SFR LENNVC354 T20-M0030
Date Description Comments
12/27/2021 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Completed Inspections

Permit Status: Issued
Permit Number: T21CM09877
Permit Description: SFR LENNVC354 T20-M0030
Total Completed Inspections - 24
Date Description Inspector Results Comments
02/15/2022 COT - RSPL - Yard Water Line Passed {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
02/15/2022 COT - RSPL - Sewer Passed {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
02/15/2022 COT - RSPL - Rough Soil Passed {Activity date: 02/15/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
03/02/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 03/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
03/02/2022 COT - RSBU - Preslab Passed {Activity date: 03/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 03/01/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR
Cancel all other inspections}
03/02/2022 COT - RSEL - Electrical Underground Passed {Activity date: 03/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
03/02/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 03/02/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
03/31/2022 COT - RSBU - Roof Nailing Passed {Activity date: 03/31/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/21/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NR}
04/13/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 04/13/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/31/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO
Remove all nails from top plates into bottom cords of trusses and install slip clips.} ; {Activity date: 03/21/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CO
1. Remove all shims & H2.5 clips at interior truss bearing points.
2. Remove all nails from ladder blocking into top of walls and install slip-clips.
3. Provide truss calcs.}
05/18/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 05/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CODE ECO}
05/18/2022 COT - RSEL - Construction Power Passed {Activity date: 05/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP
TEP ECO

}
06/27/2022 RSME - Mechanical Progress Passed {Activity date: 06/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
06/27/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 06/27/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
07/05/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 07/05/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/27/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO
1. Shim mid-bearing point of trusses in garage.
2. Replace all over-notched bearing wall studs
3. Ufer not set correctly at acorn clamp
4. Move PEX away from B-vent
5. Repair large hole in roof around B-vent}
07/05/2022 COT - LCBU - Framing Passed {Activity date: 07/05/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/27/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO}
07/05/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 07/05/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/27/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO}
07/05/2022 RSEL - Electrical Progress Passed {Activity date: 07/05/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/27/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO}
07/20/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 07/20/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
09/07/2022 COT - BULD - SWG Clearance Passed {Activity date: 09/07/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - CODE}
09/23/2022 COT - RSME - Mechanical Final Passed {Activity date: 09/23/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Approved}
09/28/2022 RSBU - Building Final Passed {Activity date: 09/28/2022; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - Truss Plan released} ; {Activity date: 09/28/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS
} ; {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/23/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Garage door needs to be adjusted for self latching.}
09/28/2022 COT - RSEL - Outdoor Lighting Passed {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - 1090.Approved}
09/28/2022 COT - RSPL - Plumbing Final Passed {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/23/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Cut minimum 6” from grade on drainage lines.} ; {Activity date: 09/07/2022; Status: Partial Approval; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - partial. Clearance for southwest gas.}
09/28/2022 COT - RSEL - Electrical Final Passed {Activity date: 09/28/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/23/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Lines coming out underneath kitchen sink. Missing cap for receptacle. A/c shut off needs to be moved over. Half hot receptacle needs correction. Receptacle in garage needs to be fixed due to broken prong.}

Documents

File Name Document Type  
FINAL SIC.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
VC 17 354 CL2.PDF DOCUMENTS VIEW
VC 17 354 PERMIT APPLICATION.PDF DOCUMENTS VIEW
VC 17 SPECIAL INSPECTION CERT 2-18-2020.PDF DOCUMENTS VIEW
VC 354 TRUSS.PDF DOCUMENTS VIEW