Permit: T21CM09845
Permit Details
Apply Date:
12/23/2021
Applicant:
Jennifer Kimura
Description:
Proposed construction of a 141,960 sf shell building and associated site work
Permit Reviews
Permit Number - T21CM09845
Permit Status: Fees due
Permit Description: Proposed construction of a 141,960 sf shell building and associated site work
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/08/2022 | RESUBMITTAL - TI ALL | 07/06/2022 | COMPLETED |
07/29/2022 | RESUBMITTAL | 08/23/2022 | COMPLETED |
09/06/2022 | RESUBMITTAL | 09/13/2022 | COMPLETED |
12/23/2021 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 02/17/2022 | COMPLETED |
04/06/2023 | COMMERCIAL REVIEW - FULL v.2 | 04/17/2023 | APPROVED |
04/06/2023 | COMMERCIAL REVIEW - FULL v.1 | 04/06/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T21CM09845
Permit Status: Fees due
Permit Description: Proposed construction of a 141,960 sf shell building and associated site work
Total Outstanding Activity Conditions - 11
Date | Name |
---|---|
04/17/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
06/16/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
06/16/2022 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
06/16/2022 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
06/16/2022 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
06/16/2022 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
06/16/2022 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
06/16/2022 | SHOP DRAWINGS REQUIRED FOR JOISTS. |
06/16/2022 | SHOP DRAWINGS REQUIRED FOR STOREFRONT. |
06/16/2022 | SHOP DRAWINGS REQUIRED FOR CURTAIN WALLS. |
09/07/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE. |
Outstanding Inspections
Permit Status: Fees Due
Permit Number: T21CM09845
Permite Description: Proposed construction of a 141,960 sf shell building and associated site work
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/16/2022 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | {Activity date: 06/16/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION.} |