Permit: T21CM09813
Permit Details
Apply Date:
12/22/2021
Applicant:
Sunrun Installation Services, Inc
Description:
- SYSTEM SIZE: 7000W DC, 4800W AC - MODULES: (20) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350 - INVERTERS: (20) ENPHASE ENERGY: IQ7-60-2-US - RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE
Contractors:
- Sunrun Installation Services, Inc
Permit Reviews
Permit Number - T21CM09813
Permit Status: Final
Permit Description: - SYSTEM SIZE: 7000W DC, 4800W AC
- MODULES: (20) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350
- INVERTERS: (20) ENPHASE ENERGY: IQ7-60-2-US
- RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/22/2021 | OTHER | 01/11/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM09813
Permit Description: - SYSTEM SIZE: 7000W DC, 4800W AC
- MODULES: (20) HANWHA Q-CELLS: Q.PEAK DUO-G8+ 350
- INVERTERS: (20) ENPHASE ENERGY: IQ7-60-2-US
- RACKING: ; SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2022 | TEP CLEARANCE - PM | RCHANDLER | Approved | CODE DGC |
| 02/24/2022 | ELECTRIC - FINAL | RCHANDLER | Approved | AP. DGC clearance for TEP. 10-12 Texted ETA at 9:19 |
| 02/24/2022 | BUILDING - FINAL | RCHANDLER | Approved | AP |