Permit: T21CM09681
Permit Details
Apply Date:
12/17/2021
Applicant:
Technicians for Sustainability
Description:
roof mount 14.22 kW photovoltaic solar system; 36 modules, 3 branches, PV subpanel, 27 kWh storage system; 2 batteries (to be installed under separate permit at a later date), 200A load center, main breaker derate
Contractors:
- Technicians for Sustainability
Permit Reviews
Permit Number - T21CM09681
Permit Status: Final
Permit Description: roof mount 14.22 kW photovoltaic solar system; 36 modules, 3 branches, PV subpanel, 27 kWh storage system; 2 batteries (to be installed under separate permit at a later date), 200A load center, main breaker derate
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/05/2022 | OTHER | 01/05/2022 | COMPLETED |
01/13/2022 | RESUBMITTAL | 03/30/2022 | COMPLETED |
04/01/2022 | RESUBMITTAL | 04/04/2022 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T21CM09681
Permit Description: roof mount 14.22 kW photovoltaic solar system; 36 modules, 3 branches, PV subpanel, 27 kWh storage system; 2 batteries (to be installed under separate permit at a later date), 200A load center, main breaker derate
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/25/2022 | TEP CLEARANCE - PM | DQUINN | Approved | CODE DGC/ 2 BATTS |
04/25/2022 | ELECTRIC - FINAL | DQUINN | Approved | Ap Clear dgc and 2 Batts Close permit |
04/25/2022 | ELECTRIC - PROGRESS | DQUINN | Approved | Ap |
04/25/2022 | BUILDING - FINAL | DQUINN | Approved | Ap |