Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
MULTI FAMILY OTHER
Apply Date:
12/15/2021
Applicant:
Craig S Molling/Colt Construction Inc
Description:
Replace the meter socket, main breaker and insulator. (NOTE) Dan Santa Cruz qualifies this as a service upgrade as there isn't another category for it.
Contractors:
  • Colt Construction Inc

Completed Inspections

Permit Status: Final
Permit Number: T21CM09606
Permit Description: Replace the meter socket, main breaker and insulator. (NOTE) Dan Santa Cruz qualifies this as a service upgrade as there isn't another category for it.
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/13/2022 TEP CLEARANCE - PM TGAUSP Approved CODE RECN/POWERKILL/UNIT #1116
01/13/2022 ELECTRIC - FINAL TGAUSP Approved Approved
01/13/2022 ELECTRIC - SERVICE UPGRADE TGAUSP Approved Approved, RECN Clearance was called into TEP at 10:40am (Powerkill) meter#159509373

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW