Permit: T21CM09557
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
11231 E PLACITA RANCHO GRANDE
Address NEW:
11231 E PLACITA RANCHO GRANDE
Apply Date:
12/14/2021
Applicant:
Description:
SFR with patio wall
Permit Reviews
Permit Number - T21CM09557
Permit Status: Complete
Permit Description: SFR with patio wall
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/12/2022 | RESUBMITTAL | 08/03/2022 | COMPLETED |
| 12/14/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 02/28/2022 | COMPLETED |
| 12/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/07/2023 | APPROVED |
| 11/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/30/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - T21CM09557
Permit Status: Complete
Permit Description: SFR with patio wall
| Date | Description | Comments |
|---|---|---|
| 02/28/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 02/28/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 02/28/2022 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 02/28/2022 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 02/28/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/03/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm | |
| 08/03/2022 | GCL or Owner/Builder Waiver required prior to permit issuance | |
| 08/25/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF PERMIT. | |
| 11/30/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM09557
Permite Description: SFR with patio wall
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - LCBU - Framing | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSBU - Stem Wall/Retaining Wall | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSEL - Electrical Underground | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSBU - Sustainability | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSBU - Masonry Pregrout | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | SPECIAL INSPECTION - Medical Gas (Third Party) | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - HCBU - Interior Shear Bracing | N/A | Canceled | Inspection Canceled |
| 02/10/2023 | COT - RSBU - Preslab | N/A | Canceled | pre-slab has been completed |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM09557
Permit Description: SFR with patio wall
Total Completed Inspections - 19