Permit Details

Status:
Withdrawn
Type:
Commercial Building
Apply Date:
12/13/2021
Applicant:
Nicholas Tomko
Description:
Development of one/two story MF apartments. Property to be subdivided into separate, legal property

Permit Reviews

Permit Number - T21CM09539
Permit Status: Withdrawn
Permit Description: Development of one/two story MF apartments. Property to be subdivided into separate, legal property
Start Date Submittal Complete Date Status  
12/13/2021 3RD PARTY REVIEW - COMMERCIAL 02/25/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM09539
Permit Status: Withdrawn
Permit Description: Development of one/two story MF apartments. Property to be subdivided into separate, legal property
Total Outstanding Activity Conditions - 5
Date Name
02/24/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
02/24/2022 SHOP DRAWINGS REQUIRED FORPOST INSTALLED ANCHORS
02/24/2022 SPECIAL INSPECTION IS REQUIRED FOR CAST-IN-PLACE BOLTS & STRUCTURAL STEEL.
02/24/2022 SHOP DRAWINGS REQUIRED FOR FIRE SUPPRESSION SYSTEM.
02/24/2022 SHOP DRAWINGS REQUIRED FOR WOOD TRUSSES AND I-JOIST.

Outstanding Inspections

Permit Status: Withdrawn
Permit Number: T21CM09539
Permite Description: Development of one/two story MF apartments. Property to be subdivided into separate, legal property
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/24/2022 COT - LCME - Mechanical Final N/A Re-inspection required {Activity date: 02/24/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION}
02/24/2022 COT - LCPL - Plumbing Final N/A Re-inspection required {Activity date: 02/24/2022; Status: Prior to Final Inspectn; Inspector: DBENOIT; Comment: Entered by DBENOIT1 - WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION}