Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/07/2021
Applicant:
Description:
New Commercial Shell Bldg

Permit Reviews

Permit Number - T21CM09396
Permit Status: Complete
Permit Description: New Commercial Shell Bldg
Start Date Submittal Complete Date Status  
05/23/2022 REVISION - - 1ST 06/29/2022 COMPLETED Review Details
08/11/2022 REVISION - - 2ND 09/22/2022 COMPLETED Review Details
12/07/2021 3RD PARTY REVIEW - COMMERCIAL 02/04/2022 COMPLETED Review Details

Conditions

Permit Number - T21CM09396
Permit Status: Complete
Permit Description: New Commercial Shell Bldg
Date Description Comments
01/25/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
01/25/2022 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
01/25/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
01/25/2022 SPECIAL INSPECTION IS REQUIRED FOR EARTHWORK.
01/25/2022 SPECIAL INSPECTION IS REQUIRED FOR EIFS.
01/25/2022 SHOP DRAWINGS REQUIRED FOR WOOD "I" JOISTS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM09396
Permite Description: New Commercial Shell Bldg
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
07/07/2022 COT - HCBU - Exterior Clips/Sheathing N/A Canceled {Activity date: 07/07/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - not applicable.}
08/31/2022 COT - LCPL - Medical Gas Preconstruction Mtg N/A Canceled {Activity date: 08/31/2022; Status: Not Applicable; Inspector: JBURGE; Comment: Entered by VVERA1 - Not applicable. No Med gas on this project.} ; {Activity date: 08/30/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 07/07/2022; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - not applicable.
}
09/15/2022 COT - LCEL - Electrical Above Ceiling N/A Canceled {Activity date: 09/15/2022; Status: Not Applicable; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NA}
10/03/2022 COT - LCPL - Gas Pressure Test N/A Canceled {Activity date: 10/03/2022; Status: Not Applicable; Inspector: TGAUSP; Comment: Entered by VVERA1 - NA, clearance at time of TI}
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/27/2022 COT - LCEL - Electrical Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
11/14/2022 COT - ENGR - Site - Assurance Release N/A Partial Pass
11/14/2022 ENGR Engineering Final N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: T21CM09396
Permit Description: New Commercial Shell Bldg
Total Completed Inspections - 34
Date Description Inspector Results Comments
03/25/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 03/25/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for shop 19

}
04/05/2022 COT - LCBU - Stem Wall/Retaining Wall Passed {Activity date: 04/05/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved}
04/28/2022 COT - LCBU - Masonry Pregrout Passed {Activity date: 04/28/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved 5th lift (top of wall) for the 3 masonry walls} ; {Activity date: 04/26/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for the 4th lift (20’) for the 3 masonry walls} ; {Activity date: 04/21/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial - 3rd lift (15’) for the 3 masonry walls

} ; {Activity date: 04/07/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for 1st lift at North and West walls} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for stem wall at north, east and west}
06/23/2022 COT - LCEL - Electrical Underground Passed {Activity date: 06/23/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for low voltage communication lines to building} ; {Activity date: 06/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - - Approved including ground to SES, okay to backfill progress areas} ; {Activity date: 06/01/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial, electrical conduits from north property line / transformer location to the building 19 SES location

} ; {Activity date: 05/26/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for electrical and data conduits starting 20’ from property line and entering the rear wall of the building, okay to backfill progress areas} ; {Activity date: 04/07/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial for conduits along north wall, okay to backfill}
07/07/2022 COT - LCPL - Plumbing Progress Passed {Activity date: 07/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/23/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for 2" water supply line from meter to the building, okay to backfill progress}
07/07/2022 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 07/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/31/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for building #19 column footings, okay to place concrete} ; {Activity date: 03/25/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial for Shop 19 building foundation on North, West and portion on East at gridline 4 minus columns, okay to pour progress areas}
07/07/2022 COT - LCBU - Preslab Passed {Activity date: 07/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
07/07/2022 COT - LCBU - Roof Nailing Passed {Activity date: 07/07/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
07/18/2022 COT - LCBU - Framing Passed {Activity date: 07/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/07/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - not ready} ; {Activity date: 06/24/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for framing above entry area canopies
}
07/18/2022 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 07/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved}
08/10/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 08/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - shop 19. Approved.}
09/01/2022 COT - LCPL - Rough Soil Passed {Activity date: 09/01/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved 4" sanitary line and 4" grease line through 500 gallon grease interceptor, both connected to existing on-site sewer main, okay to backfill progress areas

} ; {Activity date: 06/07/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, added 4" grease line building to the north property line} ; {Activity date: 05/10/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved for soil and grease lines} ; {Activity date: 04/25/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Waste and grease lines from building to site sewer installed and tested.

}
09/08/2022 COT - LCPL - Sewer Passed {Activity date: 09/08/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved 3090}
09/08/2022 COT - LCPL - Plumbing Final Passed {Activity date: 09/08/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
09/15/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 09/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, transformer and lighting}
09/15/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/15/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - CODE ECO}
09/19/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/19/2022 COT - LCEL - Electrical Progress Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved

CLEARANCE. Code: TMPP} ; {Activity date: 08/30/2022; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Not ready.}
09/19/2022 COT - LCEL - Construction Power Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/19/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/19/2022 COT - LCBU - Sustainability Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved}
09/19/2022 BULD - Electrical Clearance Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - CODE TMPP}
09/19/2022 COT - LCBU - Building Progress Passed {Activity date: 09/19/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/08/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VVERA1 - Partial for the trash enclosure top of wall bond beam, okay to grout

}
10/03/2022 COT - LCME - Mechanical Final Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - LCEL - Outdoor Lighting Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 06/23/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR} ; {Activity date: 06/20/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by VVERA1 - NR} ; {Activity date: 06/07/2022; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - NR}
10/03/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 10/03/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved}
10/14/2022 COT - FCON - Sprinkler - Final Passed {Activity date: 10/14/2022; Status: Approved; Inspector: CGates; Comment: Entered by CGATES1 - } ; {Activity date: 05/06/2022; Status: Cancelled; Inspector: CGates; Comment: Entered by CGATES1 - canceled per contractor.}
11/14/2022 COT - LCBU - Building Final Passed Approved shell bldg, pending Fire, Engineering, and Reports
11/14/2022 COT - FCON - Alarm - Final Passed
11/14/2022 COT - LCEL - Electrical Final Passed
11/14/2022 COT - FCON - Fire - Final Passed
06/28/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FINAL SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2 PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISION 2 LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
FINAL SIC.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET REV1.PDF DOCUMENTS VIEW
REV1 APPLICATION.PDF DOCUMENTS VIEW
REV1 JOB CARD.PDF DOCUMENTS VIEW
REV1 PERMIT.PDF DOCUMENTS VIEW
REV2 PLAN SET.PDF DOCUMENTS VIEW
REVISION 2 LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CUT SHEETS LIGHTING.PDF DOCUMENTS VIEW
COMCHECK.PDF DOCUMENTS VIEW
GEOTECH EVALUATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PSA.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW